Answers to the Questions Calabasas Homeowners Ask Before Hiring a Contractor
Scope, licensing, service area, timelines, and first-contact steps — all in one place.
What to Know About Working With Pure Builders
Thirteen questions. Five themes. Direct answers — no filler, no hedging.
Pure Builders Inc has operated under CSLB License 757470 — the Class B General Building Contractor classification issued by California's Contractors State License Board — since 1998. Founder and CEO Eli Kaspi has led the company throughout. The 30-person crew handles large-scale residential construction across Westside Los Angeles, Malibu, and the Conejo Valley.
These questions come up before and immediately after first contact — project scope, service area, subcontractors, licensing, timelines, and what the permit process actually looks like in LA County. Each answer is complete on its own, and where a dedicated page covers a topic in greater depth, the answer points there.
The questions you ask before the first site visit matter as much as the ones you ask after. The answers below help you show up informed.
CSLB 757470 — verifiable at cslb.ca.gov in under two minutes.
What Pure Builders Builds — and What Falls Outside the Scope
Large-scale residential construction — new homes, structural additions, whole-house renovations, and rebuilds.
What types of projects does Pure Builders Inc take on?
Large-scale residential construction is the entire focus: new custom homes, structural room additions, home add-ons, complete home renovations, house foundation construction, and full rebuilds. Every project involves a full permit set, structural engineering coordination, and active engagement with LA County Building & Safety or the applicable jurisdiction. Projects that don't fit that profile — cosmetic finishes, flooring, fixture replacement, minor kitchen updates — fall outside the company's service model. It's a deliberate scope focus built over 25 years of large-scale permitted work.
Is there a minimum project size or budget to work with Pure Builders?
No fixed dollar minimum is published. The practical threshold is consistent: Pure Builders takes on projects that require multi-trade coordination, permitted structural work, and active involvement from LA County Building & Safety or an equivalent jurisdiction. Single-trade cosmetic work, unpermitted improvements, and isolated fixture or flooring replacement aren't a fit for how the company operates. The fastest way to confirm whether your project qualifies is to describe the scope when you reach out — a site visit confirms the rest.
Does Pure Builders handle design-build, or do I need my own architect?
Pure Builders is not a design-build firm with in-house licensed architects and doesn't provide architectural design services directly. What it does handle: coordinating with the homeowner's design team, engaging the structural engineers required for the permit plan set, and managing the Title 24 energy-compliance consultants needed for submission. If you already have an architect, Pure Builders works with them directly; if you're earlier in the process and need referrals, that conversation can happen during the initial scope discussion. The permit-ready plan set — structural drawings, Title 24 documentation, and all required engineering — is fully coordinated through Pure Builders once the design direction is established.
Where Pure Builders Works
Three primary markets: Westside Los Angeles, Malibu, and the Conejo Valley.
Does Pure Builders work in Malibu?
Yes. Malibu is one of Pure Builders' three primary service markets, and the Calabasas office sits within direct reach via Malibu Canyon Road. The company has completed permitted construction projects in Malibu — including projects subject to Coastal Development Permit requirements, issued by the City of Malibu under the Local Coastal Program for construction in the coastal zone, and projects meeting CalFire fire-resistive construction standards for high-hazard fire areas. Malibu construction involves a multi-agency approval sequence that requires specific regulatory experience to navigate, and site visits there are scheduled directly from the Calabasas office. For a full breakdown, see the Hillside Construction in Malibu guide.
Does Pure Builders serve Thousand Oaks, Westlake Village & the Conejo Valley?
Yes. The full Conejo Valley — Thousand Oaks, Westlake Village, Agoura Hills, and Oak Park — is within Pure Builders' active project area. One detail that matters: jurisdiction isn't always obvious from an address. Some Valley communities fall under unincorporated LA County (routing permits through LA County Building & Safety), others under Ventura County. Pure Builders confirms the jurisdictional routing at the outset of every project, since it changes which agency receives the submission, which fee schedule applies, and which plan-check process governs — getting that right before the plan set is prepared saves significant time.
What happens at the first site visit, and what should I have ready?
The first site visit is a site assessment — a technical evaluation of the parcel's physical conditions. Pure Builders reviews the existing structure configuration, utility stub locations, grading and drainage, any site constraints affecting the design, and anything on the parcel that affects the permit pathway. No drawings or plans are required; the assessment happens before design commences, which is the correct sequence. Having the property address, any prior permit records, a survey or site plan if one exists, and a plain-language description of what you want to build makes the conversation faster — but none of it is required to schedule. Bring what you have.
Who Builds Your Project
A 30-person direct crew, plus licensed specialty subcontractors for electrical, plumbing, and HVAC.
Does Pure Builders use subcontractors, and how are they selected?
The 30-person crew handles structural construction, framing, concrete, and general building work directly. Specialty trades — licensed electricians, plumbers, and HVAC contractors — work as subcontractors operating under their own current California state licenses, the standard structure for a Class B General Building Contractor in California. The distinction matters: subcontractors on Pure Builders projects hold active, verifiable California trade licenses in their specific classification and have established working relationships with the company across prior projects.
Who is my point of contact once construction starts?
Every project is assigned a designated project lead — a Pure Builders team member responsible for day-to-day site operations, subcontractor scheduling, and inspection coordination with LA County. That project lead is the homeowner's direct line of communication during the construction phase. Eli Kaspi, as Founder and CEO, stays engaged at the principal level on every active project: the project lead manages ground-level operations, while Eli's engagement covers decisions that affect the project's direction, timeline, and scope alignment.
CSLB License 757470
Verifiable directly at cslb.ca.gov in under two minutes.
How do I verify Pure Builders' contractor license?
Go to cslb.ca.gov, use the License Check tool, and enter 757470. The result shows Pure Builders Inc as the license holder, the classification, the bond information, and the current insurance status. Verification takes under two minutes and requires nothing from the contractor — you can confirm it independently right now. California law requires contractors performing work over $500 to hold an active CSLB license, and the license number shows the classification, the scope of work authorized, and whether the bond and insurance are current. All of that information is public and searchable.
What does a CSLB general building contractor license cover?
The Class B General Building Contractor classification — the license Pure Builders holds — authorizes the holder to manage and perform construction projects involving two or more unrelated building trades or crafts. In practical terms it covers ground-up residential new construction, structural room additions, second-story add-ons, complete rebuilds, and whole-house renovations. It does not authorize specialty trade work performed under a single-trade license, which is why licensed trade subcontractors carry their own classifications for electrical, plumbing, and HVAC.
From Contract to Certificate of Occupancy
New custom homes commonly run 12 to 24 months from contract to Certificate of Occupancy in LA County.
The Certificate of Occupancy — LA County Building & Safety's final sign-off confirming a completed structure is legally habitable and rentable — is the endpoint of the entire permit and construction process. Getting there involves stages Pure Builders controls and stages that depend on agency review schedules. Understanding both categories matters before you sign a contract.
How long does a typical project take from contract to completion?
Timeline varies by project type, site conditions, and LA County's current plan-check volume. A realistic framework: plan-set preparation runs 4–8 weeks depending on design complexity and engineering; LA County first-review plan check currently runs 6–12 weeks on a standard submission (shifting with backlog and season); and construction after permit issuance runs from a few months for an addition to a year or more for a ground-up custom home, with grading, utility work, and soil conditions affecting the range. Total, contract to Certificate of Occupancy: an addition or renovation is often faster, while a new custom home or full rebuild commonly runs 12–24 months. For a full stage-by-stage breakdown of the county process, see the LA County Construction Permits page.
What happens if LA County requires revisions after submission?
LA County Building & Safety issues written correction notices when the submitted plan set has items requiring clarification or modification. Each notice lists specific items; Pure Builders prepares a written response to each and resubmits the revised set. The revised submission re-enters the review queue with a new review period — it doesn't move ahead of pending first submissions. This is a plan-check correction cycle, and multiple cycles are common; the number depends on the complexity of the corrections and how clearly the initial set addressed the applicable code. Pure Builders communicates correction-cycle status throughout, so you'll know what was flagged, what the response addressed, and where the resubmission stands in the queue.
What documents should I gather before my first conversation?
The most useful documents for a preliminary discussion are: the property address (to confirm jurisdictional routing — City of Calabasas, unincorporated LA County, or another authority — and pull assessor records); any existing survey or site plan (showing property lines, easements, and recorded conditions affecting setbacks or buildable area); prior permit records for existing structures (revealing what was permitted, what may not have been, and any outstanding inspections); and a plain-language description of the project (addition, new home, renovation — no drawing needed). None are required to schedule a site assessment; having them available makes the initial scope discussion more productive, and not having them doesn't delay anything.
Schedule a Site Assessment
Pure Builders Inc — CSLB License 757470 — has operated from Calabasas since 1998 under Founder and CEO Eli Kaspi, with a 30-person crew serving Westside Los Angeles, Malibu, and the Conejo Valley. To schedule a site assessment, call or email — a description of what you want to build is enough to start.