How does the handoff affect cost and the construction start?
The handoff affects cost and timing by making required work and unresolved dependencies visible before signing. Approved project size, specified materials, and grading or other site work shape the construction scope; remaining permits, utility coordination, inspections, and trade sequencing affect when that work can proceed.
Our ground-up custom-home work includes parcel investigation, engineering coordination, grading, permits, construction, and inspections. Those activities need to be reconciled with the actual property and approved scope, rather than priced from the drawings’ floor area alone.
For example, if a permit condition calls for utility work, identify whether that work is included in the price, who coordinates it, and which construction activities depend on it. This is a contract check, not an assumption that every property has the same utility requirements.
Plan approval alone does not establish a fixed start date or prevent later changes. A useful schedule distinguishes work ready to proceed from work waiting on a clearance, design decision, inspection, or utility action.